Foundations are built to plans — and we follow them exactly
A foundation is structural work. It’s designed by an engineer or architect, approved by your city’s building department, and inspected before concrete is placed. Our job is to build it precisely to those plans: correct dimensions, depths, steel, anchor bolts and hold-downs, on schedule for your framer.
Foundation work we do
- Continuous footings and stem walls
- Slab-on-grade foundations with thickened edges
- Isolated footings and piers for posts and decks
- Foundations for ADUs, garages, additions and accessory structures
- Grade beams and footings for retaining structures, per plans
Working with your GC, engineer or owner-builder
Plan review
We review your structural sheets before pricing so the bid matches what the inspector will look for.
Inspection-ready
Excavation, forms, steel and embeds are ready when the inspector arrives — no surprise corrections.
Clean handoff
Accurate layout and level tops make life easier for the framing crew.
ADU foundations in San Jose and Silicon Valley
Backyard ADUs are one of the most common foundation projects in the South Bay. Access is usually the challenge — tight side yards, existing landscaping and utilities. We plan excavation, steel delivery and concrete placement (often by pump) around your property, and coordinate the 811 utility locate before digging.
Foundation FAQs
Do you design foundations?
No — foundations should be designed by a licensed engineer or architect and approved by the city. We build them to those approved plans. If you don’t have plans yet, we can point you in the right direction.
Do you repair existing house foundations?
We handle concrete replacement work such as damaged footings or slab sections when the scope is defined (often by an engineer). Major structural repairs like underpinning or house leveling are specialized work; we’ll tell you honestly if your project needs a foundation-repair specialist.
How long before framing can start?
That depends on the mix and the plans, but framing usually starts a few days after the pour once the concrete has gained enough strength. Your engineer’s notes govern.